| American Recovery and Reinvestment Act (ARRA) Of 2009 |
Recovery Act Guidance
References/Downloads
1511 Certifications
|
|
Overview
The American Recovery and Reinvestment Act of 2009 (ARRA) was
enacted February 17, 2009. WIFA is expecting to receive approximately $26.5 Million
for the Clean Water program and approximately $55 Million for the Drinking Water program.
The purpose of the Act is to provide funds that will stimulate job creation through swift
initiation of infrastructure projects. The Act authorizes WIFA to provide additional
subsidization on loans. Projects that receive ARRA funds will need to be capable
of moving forward very quickly and will have additional reporting requirements.
You are strongly encouraged to read the Act which can be found at
http://www.epa.gov/recovery/.
|
1511 Certifications
|
BACK TO TOP
|
| » Clean Water (Wastewater) |
|
December 4, 2009:
Coolidge, City of: 91A141-10 - Construction costs for the Administration and Biosolids buildings;
ARRA infrastructure investment of eight hundred thousand dollars ($800,000).
|
|
December 4, 2009:
Phoenix, City of: 91A130-10 - Construction of 122 linear feet of 27-inch diameter sewer;
ARRA infrastructure investment of nine hundred sixty thousand dollars ($960,000).
|
|
December 4, 2009:
Phoenix, City of: 91A135-10 - Replacement of Broadway Road Interceptor between 51st Ave & 32nd Street;
ARRA infrastructure investment of two million dollars ($2,000,000).
|
|
December 4, 2009:
Surprise, City of: 91A137-10 - To reuse reclaimed water, the City will modify the SPA-1 Reclaimed Booster Station...;
ARRA infrastructure investment of one million two hundred thousand dollars ($1,200,000).
|
|
November 20, 2009:
Buckeye, Town of: 91A140-10 - Expansion of 1.5 MGD Plant;
ARRA infrastructure investment of one hundred seventy two thousand two hundred eighty five dollars ($172,285).
|
|
October 9, 2009:
Pima County: 91A115-10 - Design and Construction of 5 miles sewer conveyance piping;
ARRA infrastructure investment of two million dollars ($2,000,000).
|
|
September 11, 2009:
El Mirage, City of: 91A121-10 - Installation of New 18" Sewer interceptor line on El Mirage;
ARRA infrastructure investment of four hundred thirty two thousand dollars ($432,000).
|
|
August 28, 2009:
Goodyear, City of: 91A129-10 - Installation of a New Influent Sewer, Rehabilitation of the Existing Influent Lift Station;
ARRA infrastructure investment of six million four hundred thousand dollars ($6,400,000).
|
|
August 21, 2009:
Pine Creek Canyon DWID: 91A124-10 - Implementation of Innovative Stormwater Channeling and Erosion Control Techniques;
ARRA infrastructure investment of sixty three thousand dollars ($63,000).
|
|
August 21, 2009:
Mesa, City of: 91A128-10 - Replacement of the Sulfide Stations;
ARRA infrastructure investment of eight hundred fifty seven thousand eight hundred
ninety four dollars and fourty cents ($857,894.40).
|
|
August 21, 2009:
Mesa, City of: 91A127-10 - Replacement of the Existing Reclaimed Water Pump Drives;
ARRA infrastructure investment of one hundred twenty six thousand dollars ($126,000).
|
|
August 14, 2009:
Tolleson, City of: 91A134-10 - Tolleson WWTP Solids Handling Facilities Expansion;
ARRA infrastructure investment of two million dollars ($2,000,000).
|
|
July 17, 2009:
Peoria, City of: 91A118-10 - Section A - Rehabilitation of Sewer Trunk Lines;
ARRA Infrastructure Invsestment of six hundred twenty three thousand three
hundred thirty eight dollars ($623,338)
|
|
July 17, 2009:
Peoria, City of: 91A119-10 - Section B & C - Rehabilitation of Sewer Trunk Lines;
ARRA Infrastructure Invsestment of four million twenty one thousand six
hundred twenty three dollars ($4,021,623)
|
|
July 17, 2009:
Show Low, City of: 91A120-10 - Removal and Replacement of 100 Manholes;
ARRA Infrastructure Invsestment of two hundred fifty thousand dollars ($250,000)
|
|
July 10, 2009:
Lake Havasu City: 91A131-10 - Gravity Collection Sewer System Expansion;
ARRA Infrastructure Invsestment of two million dollars ($2,000,000)
|
|
April 24, 2009:
Cave Creek, Town of: 91A108-09 - Cave Creek Water Ranch (Water Reclamation Facility);
ARRA Infrastructure Invsestment of two million dollars ($2,000,000)
|
| » Drinking Water |
|
December 4, 2009:
Phoenix, City of: 92A177-10 - Water Main Replacement for the HOPE (Homeownership Opportunities for People Everywhere) VI;
ARRA infrastructure investment of one million six hundred thousand dollars ($1,600,000).
|
|
December 4, 2009:
Phoenix, City of: 92A178-10 - Replacement of approximately 55,000 meters with meters allowing for automatic reading;
ARRA infrastructure investment of three million two hundred thousand dollars ($3,200,000).
|
|
November 20, 2009:
Peoria, City of: 92A180-10 - Construction of 4,830 LF of 16-inch waterline along Pinnacle Peak Road;
ARRA infrastructure investment of seven hundred forty seven thousand four hundred dollars ($747,400).
|
|
November 6, 2009:
Arizona American Water/Tubac: 92A162-10 - Treatment of the water from Well 4 and Well 5 to comply with the EPA Arsenic MCL of 10 ppb;
ARRA infrastructure investment of one million one hundred fifty thousand dollars ($1,150,000).
|
|
November 6, 2009:
Willow Valley Water Company: 92A179-10 - Replacement of existing meters with modern meters;
ARRA infrastructure investment of one seventy four thousand dollars ($174,000).
|
|
September 22, 2009:
Valencia Water Company: 92A170-10 - Connection of two existing Evergreen No. 2 well to the centralized Sonoran Vista arsenic treatment facility;
ARRA infrastructure investment of one million twenty five thousand dollars ($1,025,000).
|
|
September 11, 2009:
El Mirage, City of: 92A153-10 - Connection of two existing water lines in Dysart Road and Thunderbird Road;
ARRA infrastructure investment of three hundred ninety eight thousand four hundred dollars ($398,400).
|
|
September 11, 2009:
El Mirage, City of: 92A152-10 - Replacement of the existing 6" ACP line in Cottonwood St;
ARRA infrastructure investment of two hundred ten thousand dollars ($210,000).
|
|
September 11, 2009:
Tempe, City of: 92A175-10 - Upgrades of Evelyn Hallman Park Water Line and Well #9 Improvements;
ARRA infrastructure investment of eleven million two hundred thirty six thousand six hundred thirty nine dollars ($11,236,639).
|
|
September 11, 2009:
Tempe, City of: 92A174-10 - Fund Western Canal Water Line and J.G. Martinez WTP Upgrades - Well 6" Pipeline Projects;
ARRA infrastructure investment of four million eighty four thousand five hundred three dollars ($4,084,503).
|
|
September 4, 2009:
Sahuarita Water Company: 92A158-10 - Construction of a 2,000 gallon per minute (gpm) centralized arsenic treatment facility;
ARRA infrastructure investment of one million eight hundred seventy seven thousand eight hundred ten dollars ($1,877,810).
|
|
September 4, 2009:
So-Hi DWID: 92A168-10 - District has identified a supplemental water source as required--an interconnection with Valley Pioneer Water Co.;
ARRA infrastructure investment of five hundred sixty thousand dollars ($560,000).
|
|
August 28, 2009:
Rim Trail DWID: 92A171-10 - Replacement of the Outdated Media and Ceramic Filter Surface Water Filtration;
ARRA infrastructure investment of one hundred sixteen thousand dollars ($116,000).
|
|
August 21, 2009:
Holiday Hills DWID: 92A165-10 - Upgrade of Main Distribution Line and Remainder of the Distribution System;
ARRA infrastructure investment of one hundred fourty thousand dollars ($140,000).
|
|
August 21, 2009:
Pine Creek Canyon DWID: 92A155-10 - Construction of a New Well of Adequate Depth and Capacity to Yield Groundwater;
ARRA infrastructure investment of three hundred twelve thousand five hundred dollars ($312,500).
|
|
August 21, 2009:
Peoria, City of: 92A149-10 - Significant Upgrade Consisting of Replacement of Many Original Functional Systems;
ARRA infrastructure investment of seven million two hundred eleven thousand five hundred seventy three
dollars and fourty cents ($7,211,573.40).
|
|
August 21, 2009:
Mesa, City of: 92A164-10 - Work that will include re-drilling a well;
ARRA infrastructure investment of five hundred thousand dollars ($500,500).
|
|
August 21, 2009:
Mesa, City of: 92A163-10 - Replacement of the Water Lines in Downtown Area of Mesa, City of;
ARRA infrastructure investment of one millin two hundred fifteen thousand and five hundred dollars ($1,215,500).
|
|
August 14, 2009:
Payson, Town of: 92A160-10 - Security Fencing of Sweetwater & Hole In The Hill Well;
ARRA infrastructure investment of four million dollars ($4,000,000).
|
|
August 14, 2009:
Groom Creek Water Users Association: 92A147-10 - Replacement and Installation of Water Distribution System;
ARRA infrastructure investment of eight hundred thousand dollars ($800,000).
|
|
July 31, 2009:
Taylor, Town of: 92A161-10 - Construction of Security Fencing Around Infrastructure sites;
ARRA infrastructure investment of fourty four thousand dollars ($44,000).
|
|
July 31, 2009:
Eloy, City of: 92A150-10 - DW104 Install 18,000 Lineal Feet of New 12-inch water main and
DW105 Install 2,300 meters will be replace with an automatic radio system;
ARRA infrastructure investment of two million eight hundred thousand dollars ($2,800,000).
|
|
July 31, 2009:
Prescott, City of: 92A166-10 - Zone 39 Water Mains, Pump Station & Water Tank;
ARRA infrastructure investment of four million dollars ($4,000,000).
|
|
July 31, 2009:
Prescott, City of: 92A154-10 - Airport Zone North and South Loops Water Mains;
ARRA infrastructure investment of two million one hundred fifty five thousand one
hundred twenty eight dollars ($2,155,128).
|
|
July 24, 2009:
Pineview Water Company: 92A157-10 - Complete a two million gallon storage tank and install pressure reducing stations;
ARRA infrastructure investment of one hundred thirteen thousand five hundred ninety one dollars ($113,591).
|
|
July 24, 2009:
Mount Tipton Water Company: 92A156-10 - Cleaning of five (5) wells and the pumps replaced;
ARRA infrastructure investment of one hundred twenty six thousand dollars ($126,000).
|
|
July 24, 2009:
Flagstaff, City of: 92A148-10 - From the Sinagua Well, the City will install a ?pit less hookup? and tie 2,064 feet of
new 8? C-900 PVC water line to the pump house;
ARRA infrastructure investment of five hundred forty two thousand five hundred dollars ($542,500).
|
|
July 17, 2009:
Maricopa Domestic Water Improvement District: 92A151-10 - Arsenic Remediation;
ARRA Infrastructure Invsestment of six hundred fourty nine thousand nine hundred one dollars ($649,901)
|
|
June 3, 2009:
Highland Pines Domestic Water Improvement District: 92A144-09 - Drinking Water Infrastructure Upgrades;
ARRA Infrastructure Investment of five hundred twenty thousand dollars ($520,000)
|
|
|
|
|
|
|